CORECUT
CoreCut

Commercial fit-out decisions

Define the removals in a condominium lobby and amenity refurbishment

By CoreCut Demolition

  • Interior scope
  • Renovation planning

A lobby, corridor and amenity room can share one design scheme while requiring different demolition. A new reception desk may leave most finishes intact; a corridor floor renewal has long retained edges; a reconfigured amenity room may involve partitions and services. Identify those packages separately before grouping them into a building programme.

CoreCut assesses selective interior removals and commercial strip-outs. Building management and the design team resolve approval, circulation and use arrangements for the actual property.

Compare the rooms by what physically changes

Compare the rooms by what physically changes: planning comparison
AreaRemoval boundaryReceiving detail to confirm
LobbyFixed desk, selected wall or floor finishesEdges beside retained entrances and systems
CorridorSpecified floor covering and included layersTransitions at suite doors and retained finishes
Amenity roomDefined partitions, joinery and finish zonesNew room arrangement and service interfaces

Scroll across the table to see all columns.

The table is an illustrative scope comparison. It does not establish that residents can use an adjoining route during work. The responsible team assesses shared services, entrances and work separation before confirming the programme.

Distinguish fixed interiors from building functions

Record loose furniture separately from attached millwork. Identify entry controls, mail facilities and other retained building equipment for the people responsible for them. Removing a reception counter is not permission to disconnect a system mounted in or beside it.

At the lobby entrance, define where the removal stops against retained glazing, flooring and walls. At amenity rooms, confirm whether a new layout affects a connected washroom or kitchen area rather than assuming the package ends at the visible partition.

Give the floor installer a specific endpoint

The flooring-handover guide distinguishes covering removal from the substrate condition needed for installation. A corridor may contain different previous repairs or layers along its length. Record known exceptions and the process for reviewing discoveries.

For an illustrative lobby renewal, the design retains the perimeter floor and replaces a desk with local finish removal. A separate amenity-room proposal removes obsolete partitions and flooring throughout the room. Those packages need different demolition boundaries even if they use the same final colour scheme.

Plan the shared route with management

Describe the material route, collection point and any booked loading or elevator access. Our loading brief helps gather those inputs. Management and the GC confirm the permitted arrangements; this page sets no board-approval rule or guaranteed resident-access plan.

Demolition handover also differs from reopening. New finishes, services, inspections and management acceptance remain separate work after removal.

Discuss the common-area package with CoreCut with the room list, retained building features, intended finish boundaries and management contact. Identify which areas are ready for assessment and which still depend on design decisions.

An amenity proposal around a retained pool needs a further boundary. The pool-area refurbishment guide separates changing-room and ordinary interior work from the pool and its specialist systems.

Back to all planning guides

Call 24/7Free estimate