Can deck posts or footings stay for the replacement?

By CoreCut Demolition

  • scope decisions
  • project preparation
Decision summary: Match the old supports to the new layout; Distinguish retain-for-review from retain-for-use; Include the ground condition in either option. Original planning illustration, not a project photograph or approved plan.
Decision summary: Match the old supports to the new layout; Distinguish retain-for-review from retain-for-use; Include the ground condition in either option. Original planning illustration, not a project photograph or approved plan.

Wanting to keep deck footings is not the same as having them accepted for a replacement deck. The new builder or designer needs to decide whether the existing supports suit the proposed work before demolition is instructed to leave them.

Match the old supports to the new layout

Provide the proposed replacement layout and identify which posts or footings you hope to retain. Their location may not suit new stairs, spans or deck dimensions. Ask the receiving builder what evidence is needed before relying on them.

The visible post does not establish the complete buried support or its condition. Treat unknown depth, construction and concealed deterioration as assessment questions. This page supplies no footing-size rule or approval for reuse; that decision belongs to the responsible designer and applicable municipal review.

Distinguish retain-for-review from retain-for-use

Mark supports that must remain untouched for assessment separately from those already accepted in the replacement plan. A label saying “keep” should explain which meaning applies. Otherwise, demolition can finish with an assumption the next builder has never agreed to.

If the exposed condition changes the decision, obtain a revised instruction before extending removal. Agree who assesses the finding and how the temporary area will be protected. The deck and fence permit guide covers the separate approval question for the overall project.

Include the ground condition in either option

If footings are removed, define what happens to the resulting holes and who prepares the site for the new work. If they remain, document their location and keep them identifiable until the builder takes over. Neither outcome should leave the next contractor guessing where buried pieces are.

Also identify the house connection, retained paving and planting beside the work. A request to preserve a footing does not imply that the ledger, framing or other old components are suitable for reuse. Keep each retained element tied to its own acceptance decision.